Skip to main content
Outdoor destinations

The Nuorttijoki river crossing cable was installed on June 10, 2025.

06/10/2025

The Nuorttijoki river crossing cable makes it easier to cross the river during the summer.

The Nuorttijoki river crossing cable has been reinstalled. The cable is located approximately 250 meters upstream from the Kärekeoja hut along the Nuorttijoki River. It makes crossing the river easier during the summer.

The cable is removed every winter and reinstalled after the spring floods.